CELIT 4D PDF

Celit 4D. Done. Comment. views. 0 faves. 0 comments. Taken on August 20, Some rights reserved. Flickr is almost certainly the best online photo management and sharing application in the world. Show off your favorite photos and videos to the world, securely. Détail pieds de mur 1 Lattage vertical 22/45 2 Celit 4D 23mm 3 structure en bois mm FJI 45/ 4 latte inférieure en Kerto 27/ 5 poutre / 6 plat en.

Author: Toshakar Meztilrajas
Country: Guinea
Language: English (Spanish)
Genre: Art
Published (Last): 27 March 2004
Pages: 132
PDF File Size: 20.95 Mb
ePub File Size: 3.52 Mb
ISBN: 605-5-27127-583-6
Downloads: 32313
Price: Free* [*Free Regsitration Required]
Uploader: Vull

Installation of the modules After the framework is installed, we start placing the modules. The house has a roof and a facade.

Three types of profiles: Introduction Traditional roofs with tiles are ventilated roofs. Additional T joins are placed to avoid movement by strong wind. The efficiency of PV cells is influenced by the temperature of the cells. The omega profiles are manufactured on demand by the local company Facozinc.

A schematic overview of the construction is given next: The house has a roof and a facade. This means that the watertight layer has a ventilated cavity under it. The first and the last profile of the roof are the special fixture profiles.

Roof details of the demo house in Mons B. General principle of the placement of one panel Inserting a panel in the top rail The placement of the EPDM joins Additional T joins are placed to avoid movement by strong wind. In this Belgium demo building we demonstrate the RS02 solar roof elements. Schrijf me in voor de nieuwsbrief. The vertical distance between 2 ALUTEC RL profiles is of celiit highest importance because this space must allow inserting the panel but must also make sure that the panels will be difficult to remove celjt the wind.

Nevertheless, the components, materials and their installation process may vary in different cases, thus the information provided in this document should be handled with care, adjusting the installation with regard to the existing roof composition in each case. Ventilated roof of the demo house in Mons B. Vul hier het contact formulier in en we contacteren u zo spoedig mogelijk. More detailed, the vertical profiles are mounted with screws over the wooden profiles and the Omega profiles on the roof surface alternately every 70 cm.

  BERNA MORAN EDEBIYAT KURAMLAR PDF

The mounting of the horizontal profiles on the vertical ones is done by the retaining clips, as shown in the picture below.

This is an h1 heading

Webshop Koop ons uitgebreid cslit bio-ecologische houtbouw- en isolatiematerialen online! Door een zeer grote marktvraag naar houtbriketten en -pellets zijn de Ecopower houtbriketten niet meer leverbaar op korte termijn. The most important difference between both types are the physic aspects. In this Belgium demo building we demonstrate the RS02 solar roof elements. Vertical and horizontal mounting rail.

Celit 4D | Peter Steen en CO | Flickr

The construction of the cavity needs enough space at the 4 and the upper part of the roof. The modules are slided in the horizontal profiles and fixed with the use of EPDM joins:. Building physics The most important difference between both types are the physic aspects. Start at the lower end of the module array.

Construction design RS02 – BFirst

After that and having mounted the second profile, we repeat the procedure to mount the rest of the profiles. Not celiit roofs have this construction.

Examples of non-ventilated asphalt shingle and ventilated tiles roofs. Eurabo cvba gebruikt cookies om uw surfervaring op deze website te verbeteren. A well insulated roof like most roofs since has a risk of internal condensation.

The roofing substructure is composed by an insulation material, a set of wooden vertical profiles and a metallic construction support system where the BIPV roofing shingles are installed.

The modules are slided in the horizontal profiles and fixed with the use of EPDM joins: The pictures below present the general principle of the module placement. The Celit 4D roof is too soft for that. Picture of the first produced module. Heeft u vragen over producten, een project of levering? Bio-ecologische houtbouw- en isolatiematerialen, deskundig advies voor vakman en consument Bezoek onze webshop.

  API 2A LRFD PDF

In order to avoid any risk of removal of a panel due to the d4, it is proposed to place an additional join T join. Subsequent corrections are then more difficult to perform than at this point in the installation process. Some are placed with their original length cm while some other are cut.

The profiles can easily screwed in the wooden bat. Over Eurabo Hoogkwalitatieve bio-ecologische, houtbouw- en isolatiematerialen, met deskundig advies voor vakman en consument. Also the openings on both sides of the cavity need to be big enough otherwise they will hinder the airflow or even stop it.

Special fixture Three types of profiles: The house has a roof and ceoit facade. For easy mounting an extra vertical wooden bat is placed on top of the Celit 4D at the location of the underlaying beam.

De precieze openingsuren van onze twee vestigingen, Eurabo Ronse en Eurabo 4x vindt u hier. Screws Wurtz screws are used to attach these aluminum 4x to the wood structure. Systeemoplossingen Ontdek vaak voorkomende bouwsystemen met onze systeemoplossingen.

Schrijf u in op onze nieuwsbrief en ontvang periodiek info over onze producten, info over opleidingen en nieuwtjes. Traditional roofs with tiles are ventilated roofs. The basic construction and the materials for construction are described in guideline b1.